Today we got big job #2 (of 3) done.  Only one to go.  Today they removed the large slide out on the driver's side of the coach and replaced the floor which was delaminating.  While the slide was out we replaced the couch with two recliners and had them replace the carpet in the slide out too.  It feels really different inside now that we are back at our campsite with the coach put back together.
Slide hanging from hoist after removal from coach.

Laying the slide down on its face so the floor is exposed for removal and replacement.

Ready for new floor.  (Note back of old sofa still inside coach.

Old sofa removed and replaced with new recliners

New recliners inside after everything is put back together.
There is a small chance we could get the last job done this week but more likely the first of next week.  That job requires some roof work and some painting and there is a lot of rain in the forecast for the next couple of days so they may want to wait until next week for the weather to be more friendly.  We are ready to start working our way back west anytime.

No comments:

Post a Comment

Posted Video

F or those of you who get our postings via email I have discovered, or I should say rediscovered, that video links do not post with the e-ma...